Water impulsion line Trinidad

Client:

OSE

Location:

Flores, Uruguay

Status:

Executive project and works of:

- Replacement of the Trinidad drinking water supply line, made of FD class K9 pipe with PN16 fittings, approximately 7630 m long.
- Interconnection of the pipeline to be constructed with the existing adductor at progressive 0+000 and with the tank supply and distribution pipeline at progressive 7+630.
- Installation of valves to be installed in the system, and replacement of the 2 existing air valves in the section already executed.
- Hydraulic transient study, executive project and rehabilitation of the protection infrastructure.
- Study of the local criticality index (LCI), definition of the type of corrosion protection for the pipeline and execution of the same.
- Distribution line to supply en-route services
- Macro-metering infrastructure with by-pass placed on the plant's premises.
- Connection of the adductor to the existing upramp and improvements.