Safety landfill for the final disposal of industrial solid wastes
Client:
GERDAU LAISA
Location:
Montevideo, Uruguay
Status:
The works for the containment of solid waste generated in the scrap melting process are being carried out.
This process generates particulate material that must be disposed of for collection.
- 1,000 m2 of solid waste disposal basins are being lined. It consists of placing the following materials in ascending order:
- High density polyethylene membrane (thickness: 1.5 mm).
- HPDPE drainage net (5 mm).
- Polypropylene geotextile.
- High density polyethylene membrane (thickness: 1.5 mm).
- Mounting of mobile metallic cover to cover 100% of the pool.