TAU 321-322

Client:

UPM

Location:

Paso de los Toros

Status:

Mechanical assembly of the units of the wastewater treatment plant.

water for the UPM Paso de los Santos pulp mill process.

Bullfighting, the most important of which are the following:

- 22 tanks of between 5 tons and 15 tons.

- Battery of 12 sand filters with a blower system.

- Dehydration area by installing belt filter and

centrifugal dehydrator.

- 2.5x6 m stop log grating and gates.

- Assembly and welding of steel micro-flotation tanks

stainless steel in total 800 ml of MIG welding.

- Assembly of mixers between 1 ton and 3 ton.

- Assembly of different chemical dosing units.