It is the construction of a new building on the waterfront of the city of
Dolores. It consists of a building with an open floor plan of parking lots, 4 floors of
house and roof terrace with barbecue area.
- Execution of piles, headers and braced beams.
- Execution of reinforced concrete columns, beams and slabs.
- Execution of subfloors and carpets, execution of masonry.
- Execution of porcelain tile coverings.
- Execution of masonry facades with aluminum openings.
- Execution of aluminum, wood and stainless steel carpentry.
- Execution of partition walls and painting.
- Sanitary and hydraulic fire installation, and electrical installation.
- Installation of weak currents: structured cabling, access control.
- Installation of artificial thermal conditioning.
- Elevator installation.
- Conditioning of exterior circulation areas and pavements.