PEPSICO Utilities

Client:

Pepsi-Cola Manufacturing Company of Uruguay S.RL.

Location:

Zona Franca, Colonia

Status:

The work consists of the expansion of the treated water room located inside the PEPSICO factory, Zona Franca de Colonia. Included are extensions to the compressed air, steam, chilled water, electrical and control systems.

The works will include the following tasks:

- Design and executive project of all new installations to be executed.
- Replacement of dryer and compressor in the compressor room with larger capacity ones supplied by PepsiCo. This includes the replacement of all galvanized pipes and the replacement of the filters upstream and downstream of the dryer. It also includes the supply and installation of support for the new pipes to be installed.
- New compressor panel and new connection and piping to it from the MCC Room. New compressor and dryer power supplies.
Laying of ducts and network cables to compressors and dryer for the incorporation of this equipment to the plant dryer.
- Dismantling of existing installations in the treated water room: Piping, electrical installations and equipment. Change of location of the 2 existing 30m3 tanks and hygienic modifications to them.
- Remodeling and expansion of the treated water facilities within the hall, which includes supply and installation of treated water pumps, ultraviolet lamps, valves, and piping for treated water, potable water, steam, condensate, compressed air and drainage.
- Assembly of new treated water skid (supplied by PepsiCo).
- New electrical installations for the treated water room, including the new electrical panel, control panels for the new pumps, conduits, wiring and grounding network.
- Supply, fabrication and asasembly of a new carbon steel platform, which will be linked to the existing platform by means of a ladder.