Paso del Gordo Bridge
Client:
Meliter S.A. / Ministry of Transport and Public Works
Location:
Durazno, Uruguay
Status:
Construction of a new bridge over Paso del Gordo to replace the old wooden bridge that represents a limitation for the flow between the towns of Paso Pereira and La Paloma de Durazno. The new bridge is 45 m long with 8 m of roadway, and of the 9-span culvert type.