San José Sanitation

Client:

OSE

Location:

San José, Uruguay

Status:

Expansion of the sewer system in different neighborhoods of the city of San José.

- Expansion of the sewerage collector network, construction of pumping wells and electromechanical installation of the same.
- Supply and installation of 1,153 m of main collector reinforcement in 400 mm diameter pipe.
- Supply and installation of 8,000 m of 200 mm diameter pipe collectors, with 627 house connections, 252 sidewalk chambers, 68 manholes and 52 terminal chambers.
- Supply and installation of 580 m of 160 mm diameter rising main.
- Removal and replacement of 850 m2 of asphalt layer.
- Removal and replacement of 12,000 m2 of double bituminous treatment.
- Turnkey construction of the pumping well in El Berral neighborhood.