Fray Marcos Treatment Plant

Client:

OSE

Location:

Florida, Uruguay

Status:

The project consists of the execution of the executive project, civil works, assembly, start-up, operation and maintenance for one year of the new effluent treatment plant in the city of Fray Marcos.

The plant consists of a set of units that perform biological treatment of the activated sludge type in the extended aeration mode with nutrient removal and disinfection by UV radiation. The final disposal of liquid effluents is carried out in the Santa Lucía River through an outfall.

The plant has the following units:
- Barometric discharge and effluent inlet area
- Desander
- Crude oil pumping well
- Integrated bioreactors
- Dry pumping well
- Satellite tank for sludge thickening
- UV disinfection unit
- Drying beds
- Beach valorization
- Control room and workshop
- Board and blower room
- Interior concrete pavements
- Outfall piping in PVC 250 mm of 1600 ml

All the structures of the units in contact with process water are built in reinforced concrete, the rooms are made of masonry with a light roof.