Operation and maintenance of the Talas del Maciel Wind Farm, Cerro Colorado, Department of Flores.
Cliente:
ASTIDEY
Fecha:
2015 - in progress
Ubicación:
Department of Flores
Status:
Operation and preventive and corrective maintenance of the BOP (Balance of Plant) of the 50 MW wind farm, which consists of 25 wind turbines of nominal power 2 MW each. It is located in the department of Flores, in the Vilas Boas area. The high/medium voltage (150/30 KV) switchyard is operated and all energizing and de-energizing maneuvers are carried out in coordination with UTE. In addition, the medium voltage (30 KV) switching cells are operated, both for the substation and the wind turbines (30 KV).
