Operation and maintenance of the Talas del Maciel Wind Farm, Cerro Colorado, Department of Flores.
Cliente:
ASTIDEY
Fecha:
2015 - in progress
Ubicación:
Department of Flores
Status:
Operation and preventive and corrective maintenance of the BOP (Balance of Plant) of the 50 MW wind farm, consisting of 25 wind turbines of nominal power 2MW each. It is located in the department of Flores, Vilas Boas spot. The high/medium voltage (150/30 KV) switchyard is operated and all energizing and de-energizing maneuvers are carried out in coordination with UTE. In addition, the medium voltage (30 kV) switchgear of both the substation and the wind turbines (30 kV) are operated.