The works include the execution of the civil works and installations detailed below:
Demolition of existing swimming pool, changing rooms, pavements and walls
Excavation and backfill
Execution of piles and foundation heads
Construction of retaining walls, beams and braces
Execution of metal structure as building support, and steel deck.
Execution of reinforced concrete slabs, subfloors and carpets.
Construction of isodeck roof and isopanel partition walls.
Execution of gypsum partition walls and ceilings + Steel framing walls,
Execution of porcelain tile, marble and granite coverings
Execution of aluminum, wood and iron carpentry.
Execution of painting works
Execution of trespa and corten steel type coatings
Sanitary and fire hydraulics installation
Electrical installation
Installation of weak currents: structured cabling, access control, closed-circuit television, intrusion detection, etc.
Fire Protection Installation
Installation of artificial thermal conditioning
Elevator installation
Placement of furniture
Landscaping: Transplanting palm trees and bermudagrass + split stone
They are performed:
60 m3 demolition
356 m3 of soil movement
32 piles + 244 m3 Reinforced concrete
21 tons of metal structure
1,250 m2 plasterboard partition walls and ceilings + Steel framing
680 m2 of cladding
725 m2 subfloors and carpets
1,400 m2 painting
290 m2 bermuda grass