Bridge over Frasquito Creek By Pass Pando
Client:
COLIER
Location:
Canelones, Uruguay
Status:
The work consists of the widening and reinforcement of the 60 m long bridge over the Frasquito Creek at the Pando By Pass.
The construction includes the execution of new piles on both sides of the bridge, new heads with stringer beams that connect to the existing foundation and new piers. It also includes reinforcement in the existing headers and 4 pillars. The road deck was increased from 12 meters to 21.8 meters wide.