Substations Kiyú Wind Farm
COBRA
San José, Uruguay
The work consists of the construction of the control buildings of the Kiyú Wind Farm's elevator substation as well as the connection substation for UTE.
In addition, the expansion of the 150kV beach is being carried out while energized and the control building of SSEE Puntas del Tigre.
The main components of the project are:
- Elevator Substation:
- Soil movement
- Concrete structure
- Isopanel roofing
- Masonry
- Low voltage electrical
- Sanitation and supply system
- Safety system
- Connection Substation:
- Soil movement
- Concrete structure
- Masonry
- Low voltage electrical
- Sanitation and supply system
- Safety system
- Puntas del Tigre substation:
- Equipment Bases
- Gantry Bases
- Supply and erection of gantry and equipment support structure
- Cable ducting
- Concrete structure
- Masonry
- Low voltage electrical
- Safety system