Datacenter Ing. José Luis Massera
ANTEL
Canelones, Uruguay.
Turnkey project for the construction of a data center building in the city of Pando.
This data center is certified TIER III level by UPTIME INSTITUTE in design and construction.
Civil Works:
- 12,500 m2 of building constructions
- 30,000 m3 of soil movement
- 17,240 m2 of concrete pavements
- 2,200 m2 of raised floor
Electrical System:
- Double UTE power supply (12MW)
- 3 Generators 2MW (n+1)
- 2 Tanks 65,000 I (n+1) w/aut.72hrs
- 6 UPS 2 (n+1) 600Kw ea.
- 1,060 Batteries autonomy 15min.
- PDU (n+1) in independent rooms
- Manageable power strips
- 22,900 m of power lines
Thermal A. System (n+1):
- 4 Chiller Trane 300 Ton
- Redundant primary and secondary pumps
- 4 Handling machines 490Kw (each) of refrigeration
- Ringed chilled water system
- Autonomy 20min each
- Kyoto Kooling System. Indirect free-cooling and chilled water for data room.
Security:
- Dedicated building designed for this purpose
- Vehicle and individual access control
- 24x7 security personnel
- CCTV and CA (proximity and fingerprint)
- RFID system for assets
Fire Protection:
- Critical areas
- VESDA detection
- 188 carafes - Extinguishing IG-55
- Common areas
- Photoelectric detection
- Extinction splinker
- 24x7 firefighting personnel